Copper cathode
Quantity: 50 - 100mt for trial. 500mt monthly.
Payment term: usance LC 90 days only.
Issue 2% P.B after LC on
Visiting factory after LC on
The procedures:
1. ICPO
2. Draft SPA
3. SPA signed by both buyer and seller.
4. Buyer issue LC Usance 90 days via Maybank.
5. Seller issue 2% P.B within 14 days after LC on
6. Laycan 30 days.
Quality : Grade A Copper Cathodes: Cu 99.99% Purity. Be rejected by Cu below 99.97%.
Dimension :
914mm x 914mm x 12mm (LME Standard)
WEIGHT OF EACH SHEET: 125kgs (+/- 1%)
NET WEIGHT OF EACH PALLET: 2MTS (+/- 1%)
Price : LME -17% discount
II.MOQ : 500MT Trial
III.PRICE : LME less 17% Discount, Net to Buyer
IV. PERFORMANCE BOND : 2%
V. PAYMENT : Revolving, Irrevocable, Confirmed, Negotiable & Non-Transferable Documentary Letter of Credit (DLC) MT 700 / SBLC(MT760) under MT 103 Release
VI.COUNTRY OF ORIGIN : Congo
VII.LOADING PORT : Dar es Salaam
VIII.DESTINATION PORT : CIF any Safety port
IX.PROCEDURE
1) Buyer favors the Seller with a Letter of Intent (LOI) + POF(BCL)
2) Sellers issues a Full Corporate Offer (FCO) to the Buyer
3) Buyer Accepts the FCO and returns it to the Seller
4) Seller issues a Sale and Purchase Agreement (SPA) to the Buyer
5) Buyer signs the SPA and returns it to the Seller
6) Upon Receipt of the Non-Operative DLC(or SBLC) from the Buyerâ??s Bank, Seller gives Proof of Product (POP) via Video Clip of the Product with the Name of BUYER and Current Date Encrypted in the Background and Mineral Analysis Report, Certificate of Origin & Export Certificate
7) Buyer`s Bank opens a Operative, Revolving Documentary Letter of Credit (DLC or SBLC) in favor of the Sellerâ??s Bank
8) Such a DLC shall be Operative, Irrevocable, Confirmed, Negotiable & Non- Transferable
9) Within 5-7 days of receipt of the Operative DLC(or SBLC), Sellerâ??s Bank will issue a 2 % Performance Bond to the Buyerâ??s Bank for all Shipments Equal to or Greater than 1,000 MT
10) Loading of Goods outward bound for the Loading Port will commence within 15 Days of receipt of the DLC by Sellerâ??s Bank
11) Buyer is invited to the Loading Port of Dar es Salaam, Tanzania, during Inspection by SGS /CIQ or any other Acceptable Inspection Company if need be.
12) The Inspection Company Inspects the Goods as they are being stuffed into Containers in the presence of the seller / Sellerâ??s Agent and an Assay Report is issued
13) Seller pays all costs of the delivery up to Buyer�´s Port of Destination
14) The cargo is booked into the Shipping Lines Company & Bill of Lading Issued
15) Based on this Inspection Report, the Seller sends Proforma Invoice along with the Bill of Lading and the other documents to his Beneficiary Bank who makes arrangements to transmit them to the Buyerâ??s Bank, electronically in line with ICC Rules UCP 600.
16) Once the Product reaches the Port of Destination, a Final Inspection is Conducted by SGS/ CIQ or any other Mutually Agreed on International Inspection Company
17) Based on this Inspection (Assay) Report, the Buyerâ??s Bank in less than , credits the 100% Value of the Invoice via TT / MT103 to the Account of the Seller against the Shipping Documents.
Commodity:
Electrolytic Copper Cathodes
Grade A
Cu 99.99% Copper
Origin: TANZANIA
Packing: Palletized
Place of Loading: MOMBASA PORT or DAR ES SALAAM PORT
Product Specifications: Grade A Electrolytic Copper Cathodes with 99.99% Copper
Non- registered LME Grade A.