New Passive PoE Injector single output 52VDC 90W PoE power supply Dual RJ45 PoE adapter for 5G Ethernet Switch Antenna
*. Input:100-240VAC 50/60Hz*. Output: 52Vdc 90W
*. AC socket: IEC320-C14, 3 pins socket
*.Ethernet rate:1G/2.5G/5G
*.Connector:1*RJ45 for PoE + 1*RJ45 for LAN
*.Pin assignment: Pin 12/36 & 45/78, 4 pairs
*.Protocol Standar:Non-IEEE802.3AF/802.3AT, Passive type
*.Appliance: IP camera, poe switch, wifi AP ect
*.output type: Single output
*.Efficiency: 85% Min
*.Ripple & Noise:480mV p-p
*.MTBF:45000hours
*. Protection:OVP SCP OCP OTP
*. Material: Plastic housing, Compliance UL 94 V-0
*. Warranty:2 years
*.Color: Black
Company Profile
* GRT established
in 2007, is the manufacturer who specialized in
research and development, production, sales, service as
one.
GRTis located in Shunde(the Kingdom of Home-Appliance),
owns several Senior professional engineers, to
research, develop and
design kinds of power supplies and provide various
customized solutions. *.All items is with 2% output
accuracy and compliance
with international standard. Owns license of Importing
and Exporting and Pass kinds of international approvals
like as UL,
GS,TUV,CCC,CE, FCC,ROHS,ERP,PSE, CB,SAA ect, suitable
for the global markets.
*.Owns ISO9001:2015 and kinds of advanced machines for
production and testing.
*.Owns two green workshops which covers area 8000
square meters. monthly output upto 880K
Our Services & Strength
*. Offer OEM service, accept print your own logo and
special requirements for package and others
*. Experienced Technical team, to provide kinds of
solutions
*. Provided authorized certifications
*. 100% Full Burn-In Testing, strictly inspect and
control during production
FAQ
1.MOQ
:500pcsas the the first order, small qty
(more than 100pcs) will be
acceptable.
2.Sample terms
*Common sample:2pcs are free offered, the
buyer shall pay for the shipping cost and
Tax; Leadtime within one week
*. Special Sample: the buyer shall pay for
the sample cost, shipping cost, Tax,
R&D cost (if caused)
Leadtime will be confirmed when the project
starting
3. Mass production
20-25 working days, from the day got the
confirmed order and payment
4. Shipment
By Sea, By Air, By Train, By Express
ect
5.Payment: T/T in advance, L/C