Please click here to check who's online and chat with them.

Lmm Group Co., Ltd.

Supplier From China
Feb-20-14

**technical specification:
1) thickness of the copper layer is more than 0.254mm(all can be done to your demand)
2) the core steel rod shall have a tensile strength of not less than 580nm/mm2.
3) the steel core is low carbon steel, and the carbon content is about 0.15%.
4) the purity of the copper using as cladding shall be 99.9% pure copper.
5) the copper ground rod will be capable of being through 90 at a maximum radius if 100mm with no copper fracture and with no ill effect on the bond between the steel and the copper cladding.
6) good in anticorrosion that usage-life is more than 50 years or more, constant low resistance and good plasticity which had the characteristics of copper as well as steel

Seaworthy exportation packaging


Key feature:


Packages & delivery & installation:
1.Jpg

16.Jpg
After-sales service:
Supervision for installation, commissioning & training for operation & maintenance

Client¡¡¥s visiting:
1.Jpg

17.Jpg

Seaworthy packaging


Feb-21-14

The walking type ship loader can be divided into powder ship loader and bulk cargo ship loader. The power ship loader


The walking type ship loader only moves in a shuttle on the track when loading and it can move position and arrange materials on the horizontal position of loading ship. The vertical moving uses the manual or electrical winch on the ship.

The comprehensive displacement of both can move position in many positions of feed part and arrange materials in the whole range of cabin.



Product show
13.Jpg12.Jpg



Mobile ship loader has following advantages:

Universal application
Flexibility
Scientific design
System integrity
High benefit performance of investment

Seaworthy packaging


Feb-21-14

1.Ship unloader, used for transiting coal, cement and clinker aggregate, etc.


2.Type of ship unloader:

1)screw continuous ship unloader

2)bridge type ship unloader

3) chain bucket type ship unloader

4)suspended ship unloader

5)pneumatic ship unloader


3.Project cases

Ship unloader.Jpg
.Jpg
P1000678-1.Jpg



We, lmm group, according to the various requirements of customers, advanced international criteria and standards for design, fabrication and inspection are adopted to ensure the varions bulk cargoes unloading work for customers.

Seaworthy packaging


Feb-21-14

Key feature:
1.Jpg



3d • designfe analysis • 3-level review policy • component process roadmap & requirement
• component single piece drawing
13_.Jpg

Process management:
1.Jpg

Welding & machining mpp • welding process flow chart • welding procedure • heat treatment procedure
Assembly procedure • painting procedure • lifting procedure.

Workshop facilities (phase 1):
1.Jpg


Welding workshop
Material preparation workshop
Machining workshop
Assembly workshop
Dimension
205m¡¨¢36m¡¨¢2
156m¡¨¢26m
217m¡¨¢36m¡¨¢2
217m¡¨¢36m
Overhead crane
2¡¨¢150t/16m
75t/16m
2¡¨¢150t/16m
2¡¨¢150t/16m
Main gate
16m¡¨¢12m
12m¡¨¢10m
16m¡¨¢12m
16m¡¨¢12m

Outdoor assembly area
1.Jpg

13.Jpg


Packages & delivery & installation:
1.Jpg

12_.Jpg

Certificates & qualification:
1.Jpg

16.Jpg
Delivery:
1_.Jpg

Seaworthy packaging


 
 
Contact Supplier
Renew

Verification Status