Mining activities are carried out with prepatory construction, including infrastructure and mining safety facilities. Environmental management facilities include sedimentation ponds for runoff water and acid mine drainage (AMD).
PT. UCI Jaya has Haul Roads 14 metres wide and 23 KM long extending to the PT. Sentosa Mulia Bahagia Coal Port in Sungai Lalan, Mangsang Village, Bayung Lencir, Sub-District, Musi Banyuasin Regency.
We also equipped with Loading Facilities such as belt conveyor with a 500 tons per hour working capacity.
PT. Sentosa Mulia Bahagia Coal port Jetty dock to pick up our products which is only 23 kilometres away from the mining site