Commodity name
Octg tubing and casing pipe manufacturers
Standard
Api spec 5ct, api spec 5b
Grade/material
J55, k55, n80, l80, c90, t95, p110 and q125
Technology
Plain pipe-end upsetting- austenite treatment-quenching-tempering-straightening-(non-destructive testing)- threading-thread inspection-coupling mpi-phosphating-coupling make up-drifting-hydrostatic testing-measuring&weight-marking&stenciling-coating-packing casing and tubing-transportation
T&c
Stc, ltc, btc, xc and premium connection
Size range
Tubing
Od: february 3 / 8'-4 1/2 '(60.3mm - 114.3mm)
Wt: 4.24mm- 16mm
Casing
Od: 4 1/2 "-20" (114.3mm-508mm)
Wt:0.205"-0.635" (5.12mm-16.13mm)
Length
Tubing
R1 (6.10m-7.32m), r2 (8.53m-9.75m), r3 (11.58m-12.80m)
Casing
R1 (4.88m-7.62m), r2 (7.62m-10.36m), r3 (10.36m-14.63m)
Testing
Ndt etc related rules of api 5ct and 5b
Packing
By bundles, seaworthy packing
Application
Casing pipe is widely used for fastening oil and gas well wall or borehold, with bigger diameter than tubing, including surface casings, technical casings and oil layer casings.
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
ASTM A 53 Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A519 Seamless Carbon and Alloy Steel Mechanical Tubing
GB/T8162 Seamless Steel Tubes for Structural Purposes
JIS G3441 Alloy steel tubes for machine purposes JIS G3444 Carbon steel tubes for general structural purposes
JIS G3445 Carbon steel tubes for machine structural purposes
DIN 2391 Seamless Precision Steel Tubes
EN10305 Steel tubes for precision applications. Technical delivery conditions. Seamless cold drawn tubes
EN 10210:Seamless structural steel pipe.
Plastic plugs in both ends, hexagonal bundles of max. 2, 000kg with several steel strips, two tags on each bundle, wrapped in waterproof paper, PVC sleeve, and sackcloth with several steel strips.
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder