Please click here to check who's online and chat with them.

Tube Investment Of India

Member From India
Aug-17-21
Buyer :

Supplier : Precision tubes cdw and erw.

Services : Manufacturer, supplier & exporter
Established: 1949 Standards: ISO 14001:2004,OHSAS 18001,IS 1161/IS 3589/IS 9295/IS 1239

Verification Status



Contact Details:
Tube Products Of India
( A Unit Of Tube Investments Of India)
Chennai To Tirupathi Highway
Ponpadi Village,, Thiruttani
Chennai 631213
Tamil Nadu India


Recent User Reviews

This user has not received any reviews yet!
 
 
Contact Member
Renew

More Items Similiar to: Tube Investment Of India

Mar-28-24
 
ERW/CDW Tubes for various applications like hydraulics, gas springs, cardan shafts, front axle, etc.
GOLD Member
VERIFIED
Aug-17-17

Erw Steel Tube

MOQ: 20  Meters
Sample Available
Supplier From Faridabad, Haryana, India
 
We deals in the following products of India, China, Taiwan and Korea Origin:-
ERW Steel Tube
GOLD Member
Dec-15-21

Precision Steel Tube Used In Cylinder

$1.56
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Sep-30-22

Precision Carbon Steel Tubes For Shock Absorber

$1.41K
MOQ: 1  Tons (US)
Sample Available
Supplier From Taian, Shandong, China
 
Product Name Precision Steel Pipe
Standard DIN2391 EN10305-1 ASTMA179 ASTM A192 ASTM A519
Material SAE1010,SAE1020,#10,#20,#45,304,316
Outer diameter 8MM-50MM
Wall thickness 0.5-50.0MM
Length fixed(3-12m) or customized
Technology High precision Cold drawn/ Cold rolled
Heat treatment BK/BKS/NBK
Advantages
Short delivery time Quality assurance Competitive price
GOLD Member
Sep-30-22

Cold Drawn Precision Tube For Gas Spring

$1.41K
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
Product Name Precision Steel Pipe
Standard DIN2391 EN10305-1 ASTMA179 ASTM A192 ASTM A519
Material SAE1010,SAE1020,#10,#20,#45,304,316
Outer diameter 8MM-50MM
Wall thickness 0.5-50.0MM
Length fixed(3-12m) or customized
Technology High precision Cold drawn/ Cold rolled
Heat treatment BK/BKS/NBK
Advantages
Short delivery time Quality assurance Competitive price
GOLD Member
Sep-30-22

Cold Rolled Precision Steel Tubes For Gas Spring

$1.65K
MOQ: 1  Tons (UK)
Sample Available
Supplier From Taian, Shandong, China
 
Product Name Precision Steel Pipe
Standard DIN2391 EN10305-1 ASTMA179 ASTM A192 ASTM A519
Material SAE1010,SAE1020,#10,#20,#45,304,316
Outer diameter 8MM-50MM
Wall thickness 0.5-50.0MM
Length fixed(3-12m) or customized
Technology High precision Cold drawn/ Cold rolled
Heat treatment BK/BKS/NBK
Advantages Short delivery time Quality assurance Competitive price
GOLD Member
Dec-15-21

A192 Gas And Water Precision Seamless Tube

$1.38
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
Mar-23-24
Supplier From pune, maharashtra, India
GOLD Member
VERIFIED
May-24-07
Supplier From Shenzhen, Guangdong, China

Verification Status