Please click here to check who's online and chat with them.

Hpl Electric & Power Ltd

Supplier From India
Jul-31-20
Supplier : Mcb, mccb, acb, onload changeover switch , automatic changeover switch, isolator, load break switch, meters, distribution board, solar products, wire & cables, led lightings, contactors, mcb changeovers

Established: 1956 Standards: ISO

Verification Status



Contact Details:
Windsor Business Park, Sec 10 Noida
Noida 201301
UP India


Recent User Reviews

This user has not received any reviews yet!
 
 
Contact Supplier
Renew

More Items Similiar to: Hpl Electric & Power Ltd

Aug-02-20
 
Onload Changeovers switch : 63 A to 3150A 4 Pole.
Automatic Changeovers switch : 40A to 630A 4 Pole.
Load break switch : 63A to 3150A 3Pole & 4Pole.
MCB type Changeovers : 25A, 40A, 63 A ; 2Pole & 4 Pole.
Aug-02-20
 
Domestic & Industrial Wire
Network cable
Control cable
specialty cables
submersible cables.
Aug-02-20
 
Array Junction Box
Main Junction Box
DC Junction Box
AC Junction Box
Solar Net Meter
Solar Cable
Solar lighting
Aug-02-20
 
LED Lamps
Mini & Full Retrofit
Consumers
Commercial
Industrial
Outdoor
smart lighting
Aug-01-20

Hpl Mccb

MOQ: Not Specified
Supplier From Noida, UP, India
 
MCCB : 10 A to 800A .
Fixed type
Adjustable
Micro processor based.
Aug-01-20
 
MCB 6A to 63 A - 6KA & 10KA : - 1P, 1PN, 2P, 3P, 3PN,4P.
GOLD Member
VERIFIED
Jun-11-25

En590 10Ppm Ulsd For Sts/tto, Export Grade

$470 - $470 / Metric Ton (FOB)
MOQ: Not Specified
Supplier From Singapore, Singapore
 
Vessels for TTO/STS EN590 available on regular basis
TERMS OF NEGOTIATION
INCOTERMS: TTO/STS
ORIGIN: EUROPEAN
INSPECTION: SGS, IQS,CIQ OR SIMILAR
INSURANCE: PAID BY SELLER, COVERING 110% OF SHIPMENT VALUE
ACCEPTABLE PAYMENT TERM: MT103/TT WIRE/USDT
COMMODITIES:
DIESEL FUEL EN590 USLD-10PPM/50PPM/500PPM GASOLINE
MINIMUM QUANTITY: 50,000 MT per Month
MAXIMUM QUANTITY: 400,000 MT Per Month
TTO/STS PRICE: USD $470 PER MT GROSS / USD 460 PER MT Net
NON-NEGOTIABLE TITLE/TANKER TAKE OVER PROCEDURE (TTO)/ SHIP
TO SHIP (STS)
1.The Buyer shall issue an Irrevocable Corporate Purchase Order (ICPO),
accompanied by the company's registration certificate and a Guarantee Letter confirming its intention to assume legal title of the product.
2.The Seller shall prepare and submit a draft Memorandum of Understanding
(MOU) to the Buyer. The Buyer shall review, countersign, and return the
executed MOU to the Seller.
3. Upon receipt of the countersigned MOU, the Seller shall provide the Buyer
with the following documentation for verification and confirmation:
A. Vessel Declaration
B. Bill of Lading
C. Loadline Report (Ullage Report)
D. Q&Q Analysis Report at Loading Port
E. Payment Invoice for Title Transfer Approval
F. Cargo Manifest
4. Upon verifying that the submitted documents, Buyer shall proceed to remit
the statutory governmental fee for Ttitle Transfer Approval in the amount of 95,000 via T/T wire transfer within two (2) international banking days. This
amount shall be deducted from the final purchase price.
5. If vessel rerouting is required, Buyer shall authorize the shipping company to
redirect the vessel to the Buyer's preferred port of discharge. The Seller shall
complete the transfer of product title to the Buyer through the relevant
governmental authority and shall issue the following documents to the Buyer:
Freshly dated Dip-Test Authorization (DTA)
Authority to Board (ATB)
Authority to Verify (ATV)
The Buyer shall then appoint SGS or an equivalent inspection agency to carry out the Q&Q analysis.
6. Upon successful completion of the dip test and once the vessel/tanker is
securely moored at the designated dock, the Buyer shall remit the remaining
balance of the purchase price via MT103 wire transfer. Following confirmation
of payment, the Seller shall issue the official Certificate of Ownership to the
Buyer, thereby finalizing the legal transfer of title. Trans-loading shall begin
immediately thereafter.
7. Trans-loading operations shall commence without delay upon confirmation of payment and title transfer.
8. The Seller shall release commissions and any agreed payments to intermediaries involved in the transaction within forty-eight (48) hours of receipt of full payment from the Buyer's bank.
7. Trans-loading commence immediately.
8. Seller will release payments to the intermediaries involved within 48 hours of receiving the Payment for the product from the Buyer's bank.
GOLD Member
VERIFIED
Jan-29-25
 
Plastic Moulded Switches
GOLD Member
Jan-09-24
 
Electric panel meters and its equipment on demand

Verification Status