Please click here to check who's online and chat with them.

Cv. Surya Citra Abadi

Supplier From Indonesia
May-03-19
Supplier : Indonesian steam coal

Established: 2010

Verification Status



Contact Details:
Samarinda East Kalimantan
Samarinda
East Kalimantan Indonesia


Recent User Reviews

This user has not received any reviews yet!
 
 
Contact Supplier
Renew

More Items Similiar to: Cv. Surya Citra Abadi

GOLD Member
Aug-30-23

Indonesian Steam Coal

$4
MOQ: 100000  Metric Tonnes
Sample Available
Supplier From Palembang, South Sumatra, Indonesia
 
We are a coal mining company with millions reserve of steam coal with GCV 3700-3800 Kcal based in Palembang, Indonesia.

Minimum order quantity is 100,000 MT/month

Price will be referring to the ICI 4 during the agreement process

Payment method: FOB on barge with document against payment collection (D/P)

Shipping term: FOB
GOLD Member
Aug-26-24

Indonesian Steam Coal Gar 3600 - 3800

$45
MOQ: 50000  Tons (US)
Supplier From Palembang, South Sumatra, Indonesia
 
We are a coal mining company based in Palembang, Indonesia.

Quantity Available: 50.000 - 100.000 MT/month.

Delivery method - FOB on barge at PT. Sentosa Mulia Bahagia coal port in Sungai Lalan, Mangsang Village, Bayung Lencir Sub-District, Musi Banyuasin Regency, Indonesia.

� Date of LAYCAN At buyer option but to be confirmed by seller.

Payment terms: FOB on barge with Documents against payment collection (D/P), wire transfer (T/T), or LC at sight to PT. UCI Jaya Bank Account.

� Price: Referring to between ICI 4 & ICI 5 on the day of the contract is being issued.
(Current Price 45 usd/MT Tonnes).
Dec-29-22

Indonesian Steam Coal

$170
MOQ: Not Specified
Supplier From Banjarmasin, South Kalimantan, Indonesia
 
Providing Indonesian Steam Coal GCV AR 6000 kcal/kg
TS 1 %
VM Range 38 - 42 %
HGI 45-55

FOB / CIF ASWP
Payment by LC at sight MT 700 at Load Port
Mar-12-21

Indonesian Steam Coal

$98
MOQ: Not Specified
Supplier From Jakarta Pusat, Jawa Barat., Indonesia
 
GAR 5800 indonesian steam coal
Fob east kalimantan.
Jan-09-23
Supplier From Singapore, Singapore
 
The Indonesia Miner Owner is doing only FOB and the coal selling price is to be determined on the day of signing the Sales and Purchase contract as the price is fluctuating too much (negotiable based on the ICI index of the week) and it will be not fair for buyer or supplier if we peg the price now.
Please indicate the Grade and Specification in the LOI, the Seller can produce of coal on various grades as per buyer requirement, documents related of the mine/coal will send to you for reference when receiving LOI
If you are interested to proceed further, kindly contact me through email for further discussion
Looking forward to hearing from you soon.

1) 6500 GAR / 6200 NAR
2) 5800 GAR / 5500 NAR
3) 5000 GAR / 4600 NAR
4) 4200 GAR / 3800 NAR
5) 3400 GAR / 3000 NAR
Jun-12-19
Supplier From Jakarta, Dki Jakarta, Indonesia
 
We can supply Indonesian Steam Coal range from low to high, 2800 GAR up to 6500 GAR. Kalimantan and Sumatera Coal. Price basis FOB Geared and Grabbed Vessel. Please contact us for details.
Oct-11-22
Supplier From Banyuwangi, Jawa Timur, Indonesia
 
We have different sources GAR 3800-6500 in kalimantan island,Indonesia.
Aug-18-23

Indonesian Steam Coal

$130
MOQ: Not Specified
Supplier From Melbourne, Victoria, Australia
 
Dive into the heart of Indonesia's rich landscapes with our premium thermal/steam coal. Renowned for its optimal energy yield, this coal is not just a fuel, but a testament to Indonesia's natural bounty. Mined responsibly from the archipelago's finest deposits, it guarantees consistent combustion and unparalleled heat generation. Suited for top-tier industrial applications, it embodies the fusion of nature's power and cutting-edge energy solutions. Embrace Indonesia's energy legacy; fuel your future with our elite thermal/steam coal.
Aug-13-12
Supplier From Bangalore, Karnataka, India
 
Gcv 5300-5100,
Gcv 5500-5300,
Gcv 5800-5600,
Gcv 6300-6100.


Bulk
Feb-13-12

Indonesian Steam Coal

$49 - $100
MOQ: Not Specified
Supplier From Dki Jakarta, Jakarta Barat, Indonesia
 
Guaranteed Coal and Table of Specifications by ASTM ANALYSIS :

Gross Calorific Value ( ADB ) : 5400 - 5300 Kcal/Kg
Gross Calorific Value ( GAR ) : 3800 - 3600 Kcal/Kg
Nett Calorific Value ( NAR ) : 3500 - 3300 Kcal/Kg

Total Moisture (ARB) : 38% - 40 % max
Inherent Moisture (ADB) : 14 % Approx
Ash Contents (ADB) : 6% - 8% max
Volatile Matter (ARB) : 43 % Approx
Fixed Carbon (ARB) : By Differance
Total Sulfur (ARB) : 0.3% - 0.6%
Size 0-55mm : 90%
H.G.I (ADB) : 55 MIN
Ash Fusion Temperature : 1200c

MINE LOCATION : Batu Ampar, S.Kalimantan
LOADING PORT : Jetty Antara, S.Kalimantan
LOADING POINT : Tanjung Pemancingan, S.Kalimantan
DELIVERY : 25 - 30 Days after LC Open
SURVEYOR : PT. Geoservices

DEPOSIT : 15 Million MT
ANNUAL SUPPLY : 3 Million MT / Year
MONTHLY SUPPLY : 300,000 MT / Month
PRODUCTION : 12,000 MT / Days

Here we provide coal prices as below :
ADB 5400-5300 / GAR 3800-3600 / NAR 3500-3300
PRICE : U$ 49.00 / MT
PAYMENT : FOB MV IRREVOCABLE 100% LC at SIGHT

ADB 5800-5600 / GAR 5000-4700 / NAR 4700-4400
PRICE : U$ 74.00 / MT
PAYMENT : FOB MV IRREVOCABLE 100% LC at SIGHT

ADB 6300-6100 / GAR 5800-5600 / NAR 5500-5300
PRICE : U$ 94.00 / MT
PAYMENT : FOB MV IRREVOCABLE 100% LC at SIGHT

ADB 6500-6300 / GAR 6100-6300 / NAR 5800-5600
PRICE : U$ 103.00 / MT
PAYMENT : FOB MV IRREVOCABLE 100% LC at SIGHT

Our miners has a good record, they can provide guarantees to loading of cargos and coal specifications, they have their own dump truck, stockpile and jetty, so you don't have to worry about dealing with them because they are very experience in this business and make all transactions go smoothly.

Our miner produce low ash and low sulphur grade coal. The Coal is from a single mine with main seam thickness of 30 - 40 metres. Quality control begins at Mine site and Port Stockpile. We engage the package services of an Independent Superintending Inspection Agency for in pit sampling and testing fro mine to Port Stockpile as well as for exports sampling analysis and weight certification on Barge or Mother Vessel.

Our mine is located at South Kalimantan with an area of concession of 50 Hectares. The capacity to produce 300,000 per month, our officers and owners have significant experience in the coal mining industry.

Our coal contains a kind of low-sulfur, low-ash and therefore low-polluting coal that can be found in only a couple of places in the world. It burns so cleanly that it meets the requirements of our clients who are environmental conscious without additional technology. It can be blended with higher grade coal to reach higher yield. Our coal is very environmentally friendly.

DRILLING & GEOLOGICAL:
Mine Geologist provide advice and expertise on the geological aspects of development and production in mine. In overseeing drilling and surface exploration, they help to determine likely directions for future development.

Typical work activities include exploring, dating and sampling mineral deposits; interpreting and mapping the geology of a mine; preparing and presenting data; checking the quality levels of materials produced for reserve assessment; classifying resources; assessing geotechnics and aquifer drainage; undertaking environmental impact studies; updating details and databases.

COAL GETTING & HAULING:
The extracted coal are loaded on to 30 tonnes coal hauling trucks and transported approximately 15 km along the hauling road to the jetty stockpile where the ROM Coal are stocked according to coal quality and processing plant.

The coal is then crushed to standards specifications and quality requirements of the clients. These coal are then loaded on the barge for onward carriage to the waiting Mother Vessel or directly to the clients premises.

STOCKPILING & COAL LOADING:
All coal producers and consumers make use of stockpiles at their facilities, either to serve as a buffer between material delivery and processing, acting as a strategic stock against supply interruptions, or to enable coal blending to meeting quality requirements. With mounting pressure to minimize the capital tied up in stockpiles, there is no need to optimize coal inventories.

BARGING, TRANSHIPMENT & SHIPPING:
Coal loaded on 300 or 330 feet flat top barge at Antara Jetty Port is transhipped through a safe Anchorage Port of Tanjung Pemancingan or Tanjung Petang. We can serve from Handy, Handymax, Supramax, Panamax and Aframax size vessels. Loading at safe Anchorage Port will be by means of self-loading geared and grabbed vessels at a loading rate of 7,000 t 8,000 Metric Tons per Weather Working Day. Gearless vessels can also be served by means of Offshore Floating Crane which has a capacity of 15,000 Metric Tons loading rate per Weather Working Day.




In bulk.

Verification Status