Gigabit ethernet 8 port switch hub
Features :
- 8 x RJ-45 10/100/1000Base-T Port (Auto MDI-MDIX)
- Full Duplex 1000 Mbit/s
- Full and Half Duplex 10/100 Mbit/s
- Supports auto-sensing for speed and duplex capability
- Store-and-forward operation support
- Performs full wire-speed switching with Head of Line (HOL) blocking prevention
- Embedded 128K Byte SRAM for packet buffer
- Support packet length up to 1522 bytes
- Support 9K byte JUBMO packet
- Integrated two-way Address-Lookup engine and table for 4K MAC addresses
- Full-duplex IEEE 802.3x flow control
- Half-duplex back pressure flow control
- Smart flow control for mix-speed connection
- 8-port Gigabit Layer 2 Switches
Features/special features:
Complies with ieee802.3 10base-t, &ieee802.3u 100base-tx standards
8 10/100mbps self-negotiable rj-45 ports; 1 uplink port
Absolute separating technology, auto-separate port with troubles
All ports support full duplex mode, support ieee802.3x full duplex flow control standard / half duplex back-pressure flow control
Built-in 2m memory
Support auto-negotiation technology, full/half duplex auto detection
Built-in separate buffer to avoid lost of data package
Store and forward
Separately external dc power ensure stability of equipment
Switch led indicator: 1 led (power)
Port led indicator: 8 leds
Power: dc7.5v/800a
Operation temperature: 0 ~ 55 íµ
Store temperature: -20 ~70 íµ
Operation moisture: 10~90%
Store moisture: 5~90%
Approval: ulú¼culú¼tuvú¼ce
EN590 10ppm Kazakhstan origin from the largest trusted Refinery in Kazakhstan available for CIF or TTO transactions Very competitive price
TCO CIF
Terms Of Transaction
Delivery Ciftto 1521 Days To Any Safe World Port
Payment Term Dlclc Blcmt 103 Tt Wire
Origin Kazakhstan
Specification To Be Provided Upon Receipt Of Buyers Loiicpo
Inspection Any Universally Accepted Qq Inspection Company
Commission To Be Shared 50 Each By Both Sides
Performance
Bond
2
Procedures Transaction Procedure CIF
1Buyer issues Irrevocable Purchase Order ICPO with buyers banking details
and passport data of buyerrepresentative
2 Seller issues Draft contract for both parties to sign within 24 hours buyer signs and send back
with guarantee letter and proof of funds to fulfil the contractual agreement
3 Seller reissues the Proof of Product documents in buyer companys name as listed below
3 a Certificate of Origin
3 b Product quality passport Analysis test Report Kazakhstan GOST R
3 c Commitment to Supply
3 d Statement of Product Availability
3 e Product Allocation Export Permit
4 Upon verification of the sellers partial POP within seven 7 banking days the buyers bank
sends irrevocable operational DLC via MT700 as per the sellers credit bank account for the first
month fee In the event of the buyers banks inability to issue the letter of credit within seven 7
banking days the buyer will make a guaranteed cash deposit of USD 300000 by TT WIRE bank
transfer to the sellers bank account as security of the product allocation and also to enable the
seller to charter a vessel and start shipping This payment will be deducted from the total cost of
the product after inspection at the port of discharge
5 Upon confirmation of buyers Letter of Credit or Cash Guarantee Deposit payment at sellers
bank seller transfer title holder of the cargo to buyer issue the 2 PB and commence loading of
the cargo into the vessel tanker Upon completion of loading the cargo seller will issue the full
POP and shipping documents to buyer as shown below
Allocation Title Ownership Certificate
TransNeft Contract to transport the product to the loading port
Port storage agreement
Charter party Agreement to transport the product to the discharge port
Tank Storage Receipt
SGS Quality and Quantity Certificate
Bill of Landing
Vessel Questionnaire 88
6 NCNDA IMFPA shall be issued for all BuyerSeller Intermediaries to complete for further
processing by the Seller
7 Shipment shall commence and upon arrival of the vessel tanker at the final discharge port the
buyer shall conduct the SGSCIQ Inspection and make the balance payment for the full shipment
via TT Wire or MT103 TT Wire Transfer
8 The seller pays all buyer and seller intermediaries the full commission amount as stated in the
NCNDAIMFPA agreement
7944 Gigabit Ethernet 8 Port Switch Hub Suppliers
Short on time? Let Gigabit Ethernet 8 Port Switch Hub sellers contact you.
EN590 10ppm & Jet Fuel A1 available .Tank to Tank procedure :
TRANSACTION PROCEDURES FOR FOB â??TTTâ??
(TANK-TO-TANK)
1. Buyer issues ICPO together with tank storage agreement (TSA) for
seller approval.
2. Seller issues Commercial Invoice (CI), ICC WARNING LETTER for the
available product quantity in the
storage tank in the terminal port.
3. Buyer signs and then returns the commercial invoice with NCNDA/IMFPA
signed by all buyer Groups
with commission structures.
4. Seller Issue (3 DAY unconditional Dip Test Authorization (DTA) to be
endorsed by Sellerâ??s Company,
Buyerâ??s Company and Buyerâ??s chosen Logistic Company. Upon confirmation
of the signed unconditional
Dip Test Authorization (DTA) by both parties, Seller programs the
injection and then issues buyer the
following documents.
A.FRESH SGS REPORT INSPECTED IN LOADING TERMINAL PORT.
B.TANK STORAGE RECEIPT (TSR) WITH GPS COORDINATES).
C.AUTHORIZATION TO VERIFY (ATV).
D.INJECTION REPORT SHORE TANK.
E.CERTIFICATE OF ORIGIN.
F.AUTHORIZATION TO SELL & COLLECT (ATSC).
5. Buyer upon physical verification of the product and PPOP
confirmation, contracts SGS to conduct the
Dip test in Seller Storage Tank on Buyerâ??s expense.
6. Upon successful Dip Test, Buyer presents the tank storage receipt
(TSR).
7. Seller commences injection immediately into buyer tank and â??issues
buyer Title of Ownership
Certificate to be followed by all export Documentation.
8. Buyer makes payment by MT103 or TT wire transfer for the total
product and lifts the product, andseller pays all
intermediary involved in the transaction
1. Buyer issues an official ICPO with the seller's procedure, passport copy, banking details along
with their Tank Storage Agreement "TSA".
2. Seller issues their Commercial Invoice "CI" to the buyer, Buyer signs and returns the commercial
invoice to the seller along with an Acceptance Letter of the sales and purchase procedure.
3. Seller verifies the buyer's storage facility and their Tank Storage Agreement (TSA) with the port
authority. (NB: Seller will issue a Tank-to-Tank Injection Agreement (TTIA) to be signed by all
parties only if buyer's TSA is engaged, not active or cannot be verified with the local port
authority).
4. Seller issues all POP documents below to the buyer upon a successful verification and approval
of the buyer TSA or after receiving the TTIA fully signed by all parties:
a. Injection Report.
b. Product Passport.
c. 24 Hours SGS Report.
d. Product Certificate of Origin.
e. Tank Storage Receipt (TSR).
f. Authorization to sell and collect.
g. Unconditional Dip-Test Authorization.
h. Product Title Holder Transfer Agreement.
i. NCNDA/IMFPA.
5. If required buyer may inspect by SGS (Dip Test In Tanks) at buyer's expense.
6. Upon successful verification of POP or Dip Test in the seller's tank, buyer provides Tank Storage
Receipt (TSR) to seller in order to issue the scheduled Injection Programming (IP) to be signed by
buyer storage facility and then injects the product into buyer's tanks.
7. Buyer makes the payment for the product via MT103, seller transfers the Title Holder &
Ownership of the product to the Buyer.
8. After successful Trial Lift (First Lift), Seller issues SPA/Contract for 12 months with R&E to
Buyer for processing.
9. Seller pays commissions to all intermediaries involved, for the initial lift and all subsequent lifts
according to the signed NCNDA/IMFPA.
Vessels for TTO/STS EN590 available on regular basis
TERMS OF NEGOTIATION
INCOTERMS: TTO/STS
ORIGIN: EUROPEAN
INSPECTION: SGS, IQS,CIQ OR SIMILAR
INSURANCE: PAID BY SELLER, COVERING 110% OF SHIPMENT VALUE
ACCEPTABLE PAYMENT TERM: MT103/TT WIRE/USDT
COMMODITIES:
DIESEL FUEL EN590 USLD-10PPM/50PPM/500PPM GASOLINE
MINIMUM QUANTITY: 50,000 MT per Month
MAXIMUM QUANTITY: 400,000 MT Per Month
TTO/STS PRICE: USD $470 PER MT GROSS / USD 460 PER MT Net
NON-NEGOTIABLE TITLE/TANKER TAKE OVER PROCEDURE (TTO)/ SHIP
TO SHIP (STS)
1.The Buyer shall issue an Irrevocable Corporate Purchase Order (ICPO),
accompanied by the company's registration certificate and a Guarantee Letter confirming its intention to assume legal title of the product.
2.The Seller shall prepare and submit a draft Memorandum of Understanding
(MOU) to the Buyer. The Buyer shall review, countersign, and return the
executed MOU to the Seller.
3. Upon receipt of the countersigned MOU, the Seller shall provide the Buyer
with the following documentation for verification and confirmation:
A. Vessel Declaration
B. Bill of Lading
C. Loadline Report (Ullage Report)
D. Q&Q Analysis Report at Loading Port
E. Payment Invoice for Title Transfer Approval
F. Cargo Manifest
4. Upon verifying that the submitted documents, Buyer shall proceed to remit
the statutory governmental fee for Ttitle Transfer Approval in the amount of 95,000 via T/T wire transfer within two (2) international banking days. This
amount shall be deducted from the final purchase price.
5. If vessel rerouting is required, Buyer shall authorize the shipping company to
redirect the vessel to the Buyer's preferred port of discharge. The Seller shall
complete the transfer of product title to the Buyer through the relevant
governmental authority and shall issue the following documents to the Buyer:
Freshly dated Dip-Test Authorization (DTA)
Authority to Board (ATB)
Authority to Verify (ATV)
The Buyer shall then appoint SGS or an equivalent inspection agency to carry out the Q&Q analysis.
6. Upon successful completion of the dip test and once the vessel/tanker is
securely moored at the designated dock, the Buyer shall remit the remaining
balance of the purchase price via MT103 wire transfer. Following confirmation
of payment, the Seller shall issue the official Certificate of Ownership to the
Buyer, thereby finalizing the legal transfer of title. Trans-loading shall begin
immediately thereafter.
7. Trans-loading operations shall commence without delay upon confirmation of payment and title transfer.
8. The Seller shall release commissions and any agreed payments to intermediaries involved in the transaction within forty-eight (48) hours of receipt of full payment from the Buyer's bank.
7. Trans-loading commence immediately.
8. Seller will release payments to the intermediaries involved within 48 hours of receiving the Payment for the product from the Buyer's bank.
EN590 ULSD available in Major Ports for FOB shipping terms, Kazakhstan Origin,
EN590 FOB price is $470/mt including $10 commission to buyer's side.
FREE ON BOARD (FOB) PROCEDURE
1. Buyer Issues ICPO:
The buyer submits an Irrevocable Corporate Purchase Order (ICPO) with banking details and passport information.
2. Seller Issues Commercial Invoice (CI):
The seller sends a Commercial Invoice (CI) for the available product, which the buyer countersigns.
3. Seller Provides POP Documents:
The seller provides Proof of Product (POP) documents, including:
SGS Report
Tank Storage Receipt (TSR)
Product Analysis
Injection Report
Authority to Verify (ATV)
Refinery Commitment Letter
Authorization to Sell and Collect (ATSC)
4. Buyer Verifies POP:
The buyer contacts the tank farm to confirm product availability.
5. Payment & Dip Test:
The buyer pays for a 5-day tank lease, and the seller issues an Unconditional Dip Test Authorization (UDTA). The tank farm provides a Clearance Access Entrance Permit (CAEP) for the dip test and SGS report.
6. NCNDA/IMFPA Signed:
All intermediaries sign the NCNDA/IMFPA and send it to the seller for endorsement.
7. Sealing & Final Payment:
After a successful dip test, the buyer requests tank sealing. The buyer pays for the full product via MT103/T/T and extends the tank lease for 48 hours.
8. Payment to Intermediaries:
The seller pays the intermediaries within 48 hours of receiving payment
Packing Configuration:
1 Box: 8 x 10 x 45 gram or
1 Box: 24 x 12 x 12 gram
Language in Packaging: English, Bahasa Indonesia.
Port of Loading: Semarang, Indonesia.
Note: We could paste sticker on each pack should there is any additional information needed (importer name, information in other language, etc)
Frito-Lays Cheetos 75 grams. 1 box = 30 pcs
Available in 2 flavors: Grilled Chicken, Roasted Corn.
Shelf Life 8 Months. Language in Packaging: English, Bahasa Indonesia. Port of Loading: Semarang, Indonesia Note: We could paste sticker on each pack should there is any additional information needed (importer name, information in other language, etc)
Frito-Lay Lay's Potato Chips.
Available in 4 flavors Nori Seaweed/ Salmon Teriyaki/ Classic Salty/ Spicy Barbecue. Available in 15/40/68 gram pack.
Shelf Life = 8 Months.
Language in Packaging = English, Bahasa Indonesia.
Port of Loading: Semarang, Indonesia.
Note: We could paste sticker on each pack should there is any additional information needed (importer name, information in other language, etc).
Frito-Lay Chitato Potato Chips.
Available in 4 flavors: Supreme Cheese/ Classic Salty/ Beef Barbecue/ Spicy Chicken.
Available in 15/40/68 gram (+15%) pack.
Shelf Life = 8 Months. Language in Packaging = English, Bahasa Indonesia.
Port of Loading: Semarang, Indonesia.
Note: We could paste sticker on each pack should there is any additional information needed (importer name, information in other language, etc).
We accomodate LCL and Mixed item FCL
Good day to you. Please allow us to introduce ourselves. We are Gopika Impex, an Indian company exporting seafood since 1996. We can offer you Indian Mackerel as follows.
Product: Indian Mackerel
Packing: Individually Frozen 10 kgs per master carton
Grade and price:
4 - 6 ---------1047 cartons @ USD 2.90 per kg
6 - 8 ---------1854 cartons @ USD 2.60 per kg
8 -10--------- 356 cartons @ USD 2.15 per kg
10-12 ------- 1352 cartons @ USD 1.90 per kg
13-15---------1115 cartons @ USD 1.35 per kg
16-20--------- 317 cases @ USD 1.10 per kg
All prices quoted are CNF Thailand, Indonesia and Malaysian main ports
Payment: By Letter of credit at sight
Loading: In the next vessel available after order confirmation
1 Box = 24 bottle
Shelf Life = 12 months
Port of Loading: Semarang, Indonesia
Note: We can arrange sticker pasting for additional labeling information if needed.
Available Variants:
1. Pokka Mango Tea 450 ml
2. Pokka Lemon Black Tea 450 ml
3. Pokka Lychee Tea 450 ml
4. Pokka Lychee Tea 350 ml
5. Pokka Oolong 450 ml
6. Pokka Natsbee Honey Lemon 450 ml
7. Pokka Jasmine Green Tea 450 ml
8. Pokka Lemon Black Tea 350 ml
9. Pokka Jasmine Green Tea 300 ml
10. Pokka Japanese Green Tea 300 ml (can)
11. Pokka Vanilla Tea 350 ml
12. Pokka Chinese Oolong Tea 300 ml (can)
Available Variants:
1. Tehbotol Sosro Glass Bottle (1 Box = 24 x 220 ml)
2. Tehbotol Sosro PET 450 ml (1 Box = 24 x 450 ml)
3. Tehbotol Sosro PET 350 ml (1 Box = 12 x 350 ml)
4. Tehbotol Sosro Pouch 230 ml (1 Box = 24 x 230 ml)
5. Tehbotol Sosro Tetra Pak 200 ml (1 Box = 24 x 200 ml)
6. Tehbotol Sosro Tetra Pak 250 ml (1 Box = 24 x 250 ml)
7. Tehbotol Sosro Tetra Pak 330 ml (1 Box = 24 x 330 ml)
8. Tehbotol Sosro Tetra Pak 1000 ml (1 Box = 12 x 1000 ml)
Shelf Life = 9 Months
Port of Loading = Semarang, Indonesia
TRANSACTION WORKING PROCEDURES CIF DELIVERY
1 Buyer issues Irrevocable Corporate Purchase Order (ICPO).
2. Seller issues SPA to Buyer. Within 48 hours Buyer signs seals and returns the SPA to seller.
3. Seller notarizes the contract, at its own expenses and submits Partial Proof of Product (via email) as follows:
A) Refinery Commitment to Supply
B) Product Passport
C) Certificate of Origin
D) Export license
E) Proforma invoice for the first month of value
f) Statement of Availability of Product
h) Company Registration
4. Within 5 banking days, Buyer's bank sends Irrevocable Operative SBLC via MT760 or DLC via MT700 according to seller's fiduciary bank
verbiage to seller nominated fiduciary offshore bank account for first month shipment,
5. Seller's Bank issues Full POP Documents to the Buyer's Bank alongside with 2% Performance Bond (PB 2%).
6. All parties finalized the signing of the NCNDA/IMFPA. The buyer will be invited by the seller to witness the loading of the product (At
Buyers Cost, Maximum of Five Personals/Representatives, Optional).
7. Seller clears vessels from the commercial's terminal (Loading Port), the buyer confirms shipping documents with ship master while
seller effects delivery to buyer destination
8. Upon the arrival of cargo at the discharge port, and after SGS/Q&Q at discharge port buyer's bank release to seller's bank payment by
TT/MT103 within 7 (Seven) banking days. Seller release payment to all intermediaries as per signed NCNDA IMFPA within 48 hours.
7944 Gigabit Ethernet 8 Port Switch Hub Suppliers
Short on time? Let Gigabit Ethernet 8 Port Switch Hub sellers contact you.