105 MW Wartsila HFO Power Plant
(7) 15.143 MW Wartsila 18 V 46 Four stroke, Direct Injected, Turbo Charged Heavy Fuel Engines and Generators, Commissioned 2001, 11000 V, 50 HZ, Engines were overhauled and have run between 400 hrs to 9000 hrs. Next overhaul is at 3000 to 11500 hours( depending on the engine) (3) Waste Heat Recovery Boilers:, Cooling system, Lube Oil system, Lubricating Oil System, Control and Monitoring System, Transformers, Electrical System, Pumps, Air System, Exhaust System, Compressed Air System, Tanks and much more. Plant can be purchased as a complete Turnkey Operation on your site if required.
Supplier: Ethanol /alcohol process line machine, ethanol/alcohol turnkey project, industry fruit process machine/production line , industry vegetable process machine/production line, industry noodle machine/production line , industry bread/cake machine/process line and so on . industry waste water treatment system process line, packing machine
Services: Our company's products, technical support, training, installation and commissioning
Supplier: Coconut, coconut coir pot, coconut oil, rattan webbing, rattan core, rattan mat, seagrass, bamboo, water hyacinth, dried fish scale, dried fish, rattan furniture, aloe vera, dried fruit, dried nut, spices, tapioca, moringa leaf, gac fruit powder, basket, straw handbag, seamoss, dried grass jelly, bamboo basket, rattan webbing cane, straw hat, tapioca starch, coir rope, coir mat, bamboo material
Services: Oem, agency, commission broker
Buyer: Industrial machinery