Please click here to check who's online and chat with them.

3 Phase 100Kw Pure Sine Solar Inverter

Supplier From China
Jun-23-16

3 Phase Pure Sine Solar Inverter 100kw motor loads
Bangzhao pure sine wave series inverter is one of the most advanced DC to AC conversion products in the world, it has the main advantages of high quality sine wave AC output, microcomputer control, humanness design, and it is simple, stable, no noise and no pollution. It is suitable use for areas without electricity, vehicles, ships, solar energy, wind turbine etc. The inverter can also supply AC voltage to all kinds of power tools, air conditioners, electric motors, refrigerators, fluorescent lights, televisions, electric fans and other power supply.
The inverter output waveform is pure sine wave; this kind of AC power is suitable for most industrial electronics and home appliances, the power supply features much better than other modified sine wave and square wave.
Technical Features:
 
* Using the fifth generation efficient IPM intelligent module from Japanese Mitsubishi, high efficiency and stable performance. It with powerful protection function, the protection for short circuit, over load, over temperature is more safe and reliable. It's service life can up to 15 years or more.
*Two kinds of start mode: Reduction Voltage Start and Variable Frequency Start. Customers can set start mode according to the type of their load. This function is very convenient for users and also reduce frequency converter's usage, which reduced the cost of equipment investment, easy to connect wires and control.
* Pure sine wave output with good transient response, little harmonic distortion, higher conversion efficiency and stable output voltage features.
*Adopted low frequency isolated transformer, high conversion efficiency and stable performance
* Output AC Power is suitable for all types of home appliances, electric tools, electric motors etc.
* Converter has the function of filtering the grid disturbance and interference at the same time, which is a good performance of stabilized voltage and frequency power, to provide a more stable and pure power supply environment for the backend devices
* Safety and reliable, the input single-phase electric and output three phase electric is complete electrical isolated.
* Pure sine wave output, has higher efficiency and higher capability of driving load.
*Output perfect protection function, with output over-voltage, overload, short circuit, over temperature, self-diagnosis protection and other protection
* Powerful data display function. LCD can display the DC input voltage, output frequency, phase voltage, phase current, AC bypass input voltage, output power KWH, time and date, temperature, fault code display.
* The input voltage, output voltage, frequency and phase can be custom made.

Price and Minimum Quantity

Price: $10000 - $15000
MOQ: Not Specified

Recent User Reviews

This user has not received any reviews yet!

Verification Status


 
 
Contact Supplier
Renew

More Items Similiar to: 3 Phase 100Kw Pure Sine Solar Inverter

GOLD Member
VERIFIED
Mar-15-25
Supplier From Singapore, Singapore
 
EN590 FOB TTV Seller Procedure
Origin : Kazakhstan
Loading port: Singapore port
UNIT PRICE : USD 490/MT
PAYMENT TERMS : MT103
TRANSACTION TERM : FOB

1. Buyer accepts seller working procedure and issue ICPO
2. Seller's issues commercial invoice (CI), Buyer signs and returns back commercial invoice.
3. Seller issue TSR with GPS coordinate to Buyer Company,
4. Buyer contacts the Seller's storage facility for tank extension to enable Buyer approval to gain access to the facility and execute the Quality & Quantity Inspection in Seller Tank Farm for FRESH Analytical Report/Result by SGS. ( Note* One day extension fee is 78,000 usd and will be deduct when buyer is paying total amount )
5. After successful DIP test, (NCNDA/IMFPA) will be signed by all parties.
6. Seller injects product into Buyer's vessel or injects into Buyer's tanks Buyer or buyer take over the storage tanks, within maximum 48 hours Buyer pays via MT 103/TT for the spot transaction and seller issues all export documents to buyer.
7. Upon conclusion of first lift transaction seller pays all intermediaries involved in the Transaction and proceeds with the signing of contract with Buyer.
GOLD Member
VERIFIED
Nov-30-24

En590 10Ppm Ulsd

$1
MOQ: Not Specified
Supplier From Singapore, Singapore
 
En590 10ppm Diesel
Vopak-to-vopak Procedure:
1- Buyer Sends Cis + Cp
2- Conference Call /meeting Between Buyer & Seller Where Both The Parties Exchanges
Vopak Tank Coordinates
3- Seller Release Ci, Buyer Counter Signs
4- Seller Releases Full Pop With Fresh Sgs Report
5- Buyer Makes Full Payment Via Mt 103
6- Seller Transfers Title To Buyer
7- Buyer Pays Commission To Intermediaries
8- Seller Issues Spa Contract For 12 Months
Platts {-} Minus 50 U$d Nwe And U$d 10.00 Commission Payable By The Buyer. Hence Net Cost To
The Buyer Will Be Nwe Platts {-} Minus 40 U$d
Product: En590-10ppm
Quantity: 100,000 Mt
Availability: Fob Rotterdam {vopak Tank/s}
Monthly Deliveries In Annual Contract
Conditions: Ncnda { Attached} And Intermediary Services CONTRACT {ATTACHED} will be signed
by the Buyer once their CIS + CP is accepted by the Seller.
GOLD Member
VERIFIED
Aug-30-24

En590 10Ppm Kazakhstan Origin

$1
MOQ: Not Specified
Supplier From Singapore, Singapore
 
CI DIP AND PAY FOB TTT Rotterdam PROCEDURE

1. Buyer sends ICPO, Company Profile along with current and valid TSA company registration certificate+ buyer passport number + company profile to seller on receipt of seller's soft corporate offer.
2. Seller issues commercial invoice of the product in tanks at the port of Rotterdam and returns commercial invoice.

3.seller will provide the Proof of Product (PPOP) documents for product verification Which include
Tank Storage Receipt (TSR)
Certificate of origin
Statement of Product Availability,
Authorization to Verify (ATV), and
Dip Test Authorization (DTA) Letter.

4.After successful verification of the PPOP, the buyer will contact the seller's Tank Storage Company to request a 1-day payment invoice to enable Buyer obtain all the necessary authorization and clearance for a Dip Test schedule.
*Or*
Buyer must have a minimum of 10 days TSR to avoid one day tank extension.

5.Upon a successful Dip Test conducted in the seller's tanks, the buyer will make the payment for the total product cost based on the SGS Report via MT103. The seller will transfer title ownership to the buyer and send all exportation documents. The buyer can then either transfer the product into a vessel or take over the seller's tanks for further storage.
6. Upon a successful Dip Test conducted in the seller's tanks, the buyer will make the payment for the total product cost based on the SGS Report via MT103. The seller will transfer title ownership to the buyer and send all exportation documents. The buyer can then either transfer the product into a vessel or take over the seller's tanks for further storage.
7. All intermediaries involved in the transaction will sign a Non- Circumvention, Non-Disclosure Agreement (NCNDA) and International Master Fee Protection Agreement (IMFPA). These documents will be forwarded to the seller for endorsement, and the seller will provide the Endorsed NCNDA/IMFPA and Authorization to Sell and Collect (ATSC).
GOLD Member
VERIFIED
Jun-11-25

En590 10Ppm Ulsd For Sts/tto, Export Grade

$470 - $470 / Metric Ton (FOB)
MOQ: Not Specified
Supplier From Singapore, Singapore
 
Vessels for TTO/STS EN590 available on regular basis
TERMS OF NEGOTIATION
INCOTERMS: TTO/STS
ORIGIN: EUROPEAN
INSPECTION: SGS, IQS,CIQ OR SIMILAR
INSURANCE: PAID BY SELLER, COVERING 110% OF SHIPMENT VALUE
ACCEPTABLE PAYMENT TERM: MT103/TT WIRE/USDT
COMMODITIES:
DIESEL FUEL EN590 USLD-10PPM/50PPM/500PPM GASOLINE
MINIMUM QUANTITY: 50,000 MT per Month
MAXIMUM QUANTITY: 400,000 MT Per Month
TTO/STS PRICE: USD $470 PER MT GROSS / USD 460 PER MT Net
NON-NEGOTIABLE TITLE/TANKER TAKE OVER PROCEDURE (TTO)/ SHIP
TO SHIP (STS)
1.The Buyer shall issue an Irrevocable Corporate Purchase Order (ICPO),
accompanied by the company's registration certificate and a Guarantee Letter confirming its intention to assume legal title of the product.
2.The Seller shall prepare and submit a draft Memorandum of Understanding
(MOU) to the Buyer. The Buyer shall review, countersign, and return the
executed MOU to the Seller.
3. Upon receipt of the countersigned MOU, the Seller shall provide the Buyer
with the following documentation for verification and confirmation:
A. Vessel Declaration
B. Bill of Lading
C. Loadline Report (Ullage Report)
D. Q&Q Analysis Report at Loading Port
E. Payment Invoice for Title Transfer Approval
F. Cargo Manifest
4. Upon verifying that the submitted documents, Buyer shall proceed to remit
the statutory governmental fee for Ttitle Transfer Approval in the amount of 95,000 via T/T wire transfer within two (2) international banking days. This
amount shall be deducted from the final purchase price.
5. If vessel rerouting is required, Buyer shall authorize the shipping company to
redirect the vessel to the Buyer's preferred port of discharge. The Seller shall
complete the transfer of product title to the Buyer through the relevant
governmental authority and shall issue the following documents to the Buyer:
Freshly dated Dip-Test Authorization (DTA)
Authority to Board (ATB)
Authority to Verify (ATV)
The Buyer shall then appoint SGS or an equivalent inspection agency to carry out the Q&Q analysis.
6. Upon successful completion of the dip test and once the vessel/tanker is
securely moored at the designated dock, the Buyer shall remit the remaining
balance of the purchase price via MT103 wire transfer. Following confirmation
of payment, the Seller shall issue the official Certificate of Ownership to the
Buyer, thereby finalizing the legal transfer of title. Trans-loading shall begin
immediately thereafter.
7. Trans-loading operations shall commence without delay upon confirmation of payment and title transfer.
8. The Seller shall release commissions and any agreed payments to intermediaries involved in the transaction within forty-eight (48) hours of receipt of full payment from the Buyer's bank.
7. Trans-loading commence immediately.
8. Seller will release payments to the intermediaries involved within 48 hours of receiving the Payment for the product from the Buyer's bank.
GOLD Member
VERIFIED
Oct-12-21
Buyer From Aurangabad, Maharashtra, India
Sep-06-22
 
1.Running without battery
2.Pure sine wave inverter
3.Off grid
4.MPPT controller:80A
5.Maximum PV Array Power:2KW
6.Voltage:24V
GOLD Member
VERIFIED
Apr-24-25

En590 10Ppm Ulsd, Export Grade

$1 - $1 / Metric Ton (FOB)
MOQ: 50,000  Metric Tonnes
Supplier From Singapore, Singapore
 
EN590 10ppm ULSD Diesel available. Vessel to Tank transaction in Jurong port Singapore.No upfront payment.
VTT price $460/MT including $10 commission to buyer's side.
1. Buyer send ICPO with TSA
2. Seller issue CI
3. Seller sends to Buyer the following documents for Buyer's confirmation.
A. Q88
B. Bill of Lading
C. Estimated Time of Arrival E.TA.
D. Q&Q Analysis Report by IQS at loading Port.
E. Ullage/load line report
F. Cargo Manifest.
4. Buyer receives documents and sends Tank Storage Receipt for injection of
product to buyers tanks.
5. Seller injects products to buyers tanks and Buyer order SGS or Equivalent
inspection team for Q&Q inspection.
6. Upon the successful completion of Dip-test inspection, Buyer makes payment
by MT103 wire transfer for the total goods value, Seller transfers Title of ownership Certificate to buyer's name as the legitimate owner of the goods.
7. Seller will release payments to the intermediaries involved within 48 hours of receiving the Payment for the product from the Buyer's bank.
GOLD Member
VERIFIED
Mar-31-25

En590 10Ppm Fob Jurong, Export Grade

$1 - $1 / Metric Ton (FOB)
MOQ: 50,000  Metric Tonnes
Supplier From Singapore, Singapore
 
FOB Singapore
EN 590 price $480/MT

FOB TRANSACTION PROCEDURES
1. Buyer Issues ICPO, Company Registration Certificate and Tank Storage Agreement(TSA)for
seller approval.
2. Seller issues COMMERCIAL INVOICE (CI), STATEMENT OF PRODUCT AVAILABILITY, and
COMMITMENT to SUPPLY the available quantity in the Storage Tank and then program the
injection. THIS USUALLY DEPENDS ON THE LOCATION.
3. Buyer countersigns Commercial Invoice (CI) & Warning Letter with NCNDA/IMFPA signed
by all Buyer groups with commission structures.
4. Send the below proof of product (Documents) via email If Necessary.
Fresh SGS (Q&Q report) less than 48 hours.
Tank storage receipt. (TSR).
Authorization to verify (ATV).
Injection report Shore Tank (IR).
Certificate of Origin.
Product passport.
Authorization to Sell and collect (ATSC).
5. After the successful verification of the product existence, buyer order SGS to conduct their
Dip-Test in the seller tank on buyer expense and then issues buyer.
â?¢ Unconditional Dip Test Authorization (UDTA).
â?¢ ATSC authorization to Sell/Collect.
â?¢ Title of Ownership Certificate, (on seller expense).
6. Upon the successful dip test, Buyer presents their tank storage receipt (TSR), Seller issues
all export Documentation.
7. Buyer makes payment by MT103 or TT wire transfer for the total product and lifts the
product and seller pays all Intermediary involved on the transaction.
GOLD Member
VERIFIED
Oct-14-24

En590 10 Ppm Ulsd

$1
MOQ: Not Specified
Supplier From Singapore, Singapore
 
EN 590 10ppm CIF PRICE $370/360

TRANSACTION WORKING PROCEDURES CIF DELIVERY
1 Buyer issues Irrevocable Corporate Purchase Order (ICPO).
2. Seller issues SPA to Buyer. Within 48 hours Buyer signs seals and returns the SPA to seller.
3. Seller notarizes the contract, at its own expenses and submits Partial Proof of Product (via email) as follows:
A) Refinery Commitment to Supply
B) Product Passport
C) Certificate of Origin
D) Export license
E) Proforma invoice for the first month of value
f) Statement of Availability of Product
h) Company Registration
4. Within 5 banking days, Buyer's bank sends Irrevocable Operative SBLC via MT760 or DLC via MT700 according to seller's fiduciary bank
verbiage to seller nominated fiduciary offshore bank account for first month shipment,
5. Seller's Bank issues Full POP Documents to the Buyer's Bank alongside with 2% Performance Bond (PB 2%).
6. All parties finalized the signing of the NCNDA/IMFPA. The buyer will be invited by the seller to witness the loading of the product (At
Buyers Cost, Maximum of Five Personals/Representatives, Optional).
7. Seller clears vessels from the commercial's terminal (Loading Port), the buyer confirms shipping documents with ship master while
seller effects delivery to buyer destination
8. Upon the arrival of cargo at the discharge port, and after SGS/Q&Q at discharge port buyer's bank release to seller's bank payment by
TT/MT103 within 7 (Seven) banking days. Seller release payment to all intermediaries as per signed NCNDA IMFPA within 48 hours.

Verification Status