cion.
(2) plate, pipe cutting, bending & maching.
(3) fit-up, welding, nde inspection.
(4) pwht, annealing, tempering is if required.
(5) pre-assembly of derrick type.
(6) coating.( paint & hdgv)
(7) export packing & delivery.
7. Delivery period
(1) less than 100ton : within 1 months after receiving the advance payment.
(2) 100ton ~ 300ton : within 2 months after receiving the advance payment.
(3) 300ton ~ 600ton : within 3 months after receiving the advance payment.
(4) 600ton ~ 1500ton : within 4 months after receiving the advance payment.
Safety packing
Supplier: Power transmission tower, communication tower, broadcast & TV tower, torch tower, pressure vessle, wind turbine tower, submerged ARC welding pipe & other steel structure such as railway, bridge, building, warehouse building, offshore flare system, onshore, offshore drilling rig