The test systems generate lightning impulse voltage (li, 1.2/50 s), chopping lightning impulse voltages (lic, front time 1.2 |¨¬s, front, crest or tail chopped), and switching impulse voltage (si, 250/2500 s) in accordance with iec 60060-1; as well as iec 60076-3 for transformers, and iec 62067, 60840 und 60502-1 for cables).
Depending on specifications