• Speed of construction - 4days per floor construction cycle.
• Formwork can be re-used over 300 times.
• No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.
• Externally, a good quality textured paint applied provides a high quality finish, again no plastering required.
• Ceramic tiling can be fixed directly unto the formed concrete finish, again no plastering required to straighten the walls.
• No scaffolding required to construct the concrete structure as we provide integrated working platform brackets to We offer a complete redesign service of your formwork into your next project maximizing the number of re-uses.
Supplier: Specially barcode labels, printed product labels, thermal transfer ribbons (ttr), chromo barcode label, direct thermal barcode label, shipping barcode label, garden fencing, chain link fence fittings, scaffolding system, scaffolding drop forged clamps, pressed scaffolding fittings, scaffolding formwork accessories,
scaffolding accessories, cuplock accessories, guard rail, shoring system accessories, jack nuts, black iron door fittings