Please click here to check who's online and chat with them.

Jk Plastmaxx - Rush Coat - Rs11

Supplier From United Arab Emirates
Mar-29-23

JK PlastMaxX - Rush Coat - RS11

Price and Minimum Quantity

Price: Negotiable
MOQ: Not Specified

Recent User Reviews

This user has not received any reviews yet!

Verification Status


 
 
Contact Supplier
Renew

More Items Similiar to: Jk Plastmaxx - Rush Coat - Rs11

Mar-29-23
Supplier From Dubai, United Arab Emirates
 
JK PlastMaxX - Rush Coat Premium - RS99
VERIFIED
Feb-07-20
Supplier From Ahmedabad, Gujarat, India
Mar-29-23
Supplier From Dubai, United Arab Emirates
 
JK PlastMaxX - Cement Plaster Render - PP11
Mar-29-23
Supplier From Dubai, United Arab Emirates
 
JK PlastMaxX - Cement Plaster Render Light - PP22
GOLD Member
VERIFIED
Jun-16-25

Upvc Cement Heavy Bodied, A

$1 - $2 / Kilogram (FOB)
MOQ: Not Specified
Supplier From Sangrur, Punjab, India
 
DIRECTIONS FOR USE:
Shake well before using.
Keep container closed when not in use.
Set time is the time required before joint can safely be handled.
Cure time is the time required before joint can be pressure tested.

1. Cut pipe square with saw or hand cutter. Remove all burrs.
2. Check dry fit of pipe and fitting. Pipe should easily go way into fitting. If pipe bottoms into fitting
it should be very snug.
3. Pipe and Fitting should be free of dirt, grease and other foreign materials. If necessary clean pipe and
fitting using RPC-WELD Pipe Cleaner. Primer is highly recommended for 3 and larger diameter installation.
Apply liberal coat. Primer will start softening surface of pipe and fitting thus ensuring superior joint.
4. Use applicator supplied with the can or suitable applicator at least the size of the pipe diameter
5. Apply liberal coat of cement to the pipe (equal to depth of fitting) and adequate coat inside of fitting.
Make sure there is no uncoated surface. Avoid puddling of cement, it may weaken the joint.
6. Immediately insert pipe into fitting with twisting motion. Cement should be wet. If it has dried recoat both parts.
Use sufficient force to ensure pipe bottoms into fitting.
7. Hold joint together for 30-40 seconds to make sure pipe is not pushed out longer time if temperature is low
and for larger pipes.
8. Allow 15 minutes set time before handling the assembly and 2 hours cure time if temperature is below 16 C or
60 F Longer cure time may be required for larger pipe and /or temperature is below 16 C or 6

Raw Materials from U.S.A
GOLD Member
VERIFIED
Jun-16-25

Pvc Cement Heavy Bodied, A

$1 - $2 / Kilogram (FOB)
MOQ: Not Specified
Supplier From Sangrur, Punjab, India
 
ASTM D2564 STANDARD:

RPC-WELD PVC solvent cements have passed the following tests performed according to ASTM Standard D2564

Test Pressure
2 hour Hydrostatic Burst Test 400 psi
2 Hour Lap Shear Test 250 psi
16 Hour Lap Shear Test 500 psi
72 Hour Lap Shear Test 900 psi

DIRECTIONS:
Keep container close when not in use
Set time is the time required before joint can safely be handled.
Cure time is the time required before joint can be pressure tested

1. Cut pipe square with saw or hand cutter. Remove all burrs.
2. Check dry fit of pipe and fitting. Pipe should easily go to way into fitting. If pipe bottoms into fitting
it should be very snug.
3. Pipe and Fitting should be free of dirt, grease and other foreign materials. If necessary clean pipe and
fitting using RPC-WELD Pipe Cleaner. Primer is highly recommended for 3 and larger diameter installation.
Apply liberal coat. Primer will start softening surface of pipe and fitting thus ensuring superior joint.
4. Use applicator supplied with the can or suitable applicator at least the size of the pipe diameter
5. Apply liberal coat of cement to the pipe (equal to depth of fitting) and adequate coat inside of fitting.
Make sure there is no uncoated surface. Avoid puddling of cement, it may weaken the joint.
6. Immediately insert pipe into fitting with twisting motion. Cement should be wet. If it has dried recoat both parts.
Use sufficient force to ensure pipe bottoms into fitting.
7. Hold joint together for 30-40 seconds to make sure pipe is not pushed out longer time if temperature is low
and for larger pipes.
8. Allow 15 minutes set time before handling the assembly and 2 hours cure time if temperature is below 60 F.
Longer cure time may be required for larger pipe and /or if temperature is below 60 F.
Do not test with compressed air.

CURE TIME GUIDE: Consult ASTM schedule

Raw Materials from U.S.A
VERIFIED
Dec-11-13
Supplier From Thrissur, Kerala, India
Supplier Of Wheat   |   Pulses   |   Printing Paper   |   Coffee   |   Coconut By-Products   |   Pepper   |   Cement   |   Tea Bag   |   Rice   |   Coconut Oil   |   Coconut   |   Paints & Coatings   |   Sunflower Oil
VERIFIED
Apr-16-19
Buyer From Kanpur, Uttar Pradesh, India
VERIFIED
Nov-02-21
Supplier From Cairo, Egypt

Verification Status