Specifications:
Suppler prerequisates: Actual allocation holder, or possess Power of Attorney to sell
Must submit Technical Specifications Sheet of actual product. Seller can issue offer and draft purchase contract
TERM CONTRACT: 12 months with extension
PRICE: best pricing per MT
Looking suppliers from: Turkey and Middle East
Quantity Required : PER SHIPMENT; MIN 50000 MT
Note: Looking for suppliers from : Turkey, United Arab Emirates; OTHER VALID SOURCES.
Quantity Required : 50000 Metric Ton/Metric Tons
Shipping Terms : FOB / CIF
Destination Port : Eu Port/ Ara /Nwe - Rotterdam,,
Payment Terms : 1st cargo ( after inspection ) via MT103, monthly shipments via Irrevocable, revolving, DLC
Looking for suppliers from : Turkey, United Arab Emirates
Specifications:
Non-Russian origin, non-sanctioned goods
Quantity: minimum quantity to 500,000 BBL
from 500,000 barrels up to 10 million barrels
- if everything is put on the table and shown to each other
- if there is little paperwork
- for mutual inspection
Before, Buyer and seller make a small contract, meet and the deal is closed.
In short, this means that if the seller and owner of the goods or the seller mandate on site in Rotterdam shows the most important proofs, the buyer shows all proofs, the purchase can be finalized.
The buyer is interested in a 12-60 month contract.
Payment Terms:
T103 after successful SGS dip test No advance payments, SBLCs, or deposits before POP POP documents (TSR, UDTA, ATV, Q88/NOR, SGS, Passport, Commitment to Supply) must be provided before dip test
Destination:
Rotterdam, Netherlands
Looking for suppliers from:
Worldwide except India, China
Product Description
Please provide a quotation to the following requirement from importer -
Product name - EN590 10ppm ULSD Diesel Fuel
Specifcations :-
Type - EN590 10ppm Ultra-Low Sulphur Diesel.
Quantity - 50,000 MT (spot or contract)
Quantity Required : 50000 Metric Ton/Metric Tons
Shipping Terms : FOB
Destination Port : Rotterdam, Netherlands
Payment Terms : T103 after successful SGS dip test No advance payments, SBLCs, or deposits before POP POP documents (TSR, UDTA, ATV, Q88/NOR, SGS, Passport, Commitment to Supply) must be provided before dip test