We design & supply PLC Panel For Hydro Power Plant With SCADA
System Architecture:
Control Room
LT Panel Room
33 KV Switch Yard
2 nos. Frances Turbine Units.
Remote Terminal Connectivity on IEC-60870-5-101
PLC Panel Connected with Switch Yard, LT Panels And all Field Instruments.
Control Features on SCADA:
Hydro Turbine Governing
Hydro Turbine Synchronising
Hydro Turbine Control and Safeties
HT Feeders on on/of Control.
Generator Breakers on/off Control.
Isolator on/off Control
Turbine Auto Start/Stop Control
Load Raise/ Load Lower Control
Remote Terminal Control On Units.
Display Features:
On/off Status For All Incomers And Outgoing Feeders.
Tripping Status For All Incomers And Outgoing Feeders.
Tripping Status For All Protection Relays.
Charged Bus Bar Status.
Voltage, Current, KWH, HZ, KW, Kvar Display For All Feeders
Units Tripping Status
Generator Parameters Display
Turbine Parameters Display
OPU Parameters Display
GLOP Parameters Display
Switch Yard Parameters Display.
Data Logging Features:
Time Base Data Logging Facility
Shift Wise Data Logging.
Event Data Logging.
Alarm Data Logging.
Turbine Running Hour Data Logging
Turbine, Generator, Transformer And Bus Bar Temperature Data Logging.
Trending:
Current Trending For Power Parameters(Voltage, Current, KW)
Historical Trending For Power Parameters.
Report Printing:
Trend Screen Printing
Shift Report Printing
Historical Data Printing For Logged Power Parameters, Alarm And Events.
Other Details: