Payment Terms:
100% Irrevocable or transferable LC MT 700 wiht monthly SBLC MT 760/MT agaist thet documents of the loading port and the SGS and Qand Q Audit repot of the loading port at the loading port or confirmed from top banks. Cif Delivery Fob payment
Destination:
Santos Port, Brazil
Looking for suppliers from:
Worldwide
Product Description
The buyer would like to receive quotations for -
Product Name: Crude Sunflower Oil
Specifications:
Crude: 6,000 Mton *12 month Total 72,000 mt
Approx 2% PB will be given after buyers bank guarantee is approved.
110% by the seller
Crude: 940USD
Packaging Terms : in the pet bottle and international standard Crude in the Flexitanks
Quantity Required : 6000 Metric Ton/Metric Tons
Shipping Terms : CIF
Destination Port : Santos Port, Brazil
Payment Terms : 100% Irrevocable or transferable LC MT 700 wiht monthly SBLC MT 760/MT agaist thet documents of the loading port and the SGS and Qand Q Audit repot of the loading port at the loading port or confirmed from top banks. Cif Delivery Fob payment
Payment Terms:
100% Irrevocable or transferable LC MT 700 wiht monthly SBLC MT 760/MT agaist thet documents of the loading port and the SGS and Qand Q Audit repot of the loading port at the loading port or confirmed from top banks. Cif Delivery Fob payment
Destination:
Mersin Port, Turkey
Looking for suppliers from:
Worldwide
Product Description
Please provide a quotation to the following requirement from importer -
Product Name: Crude And Refined Sunflower Oil
Specifications :
Quantity: 12,500 Mton *12 Month
Total 150,000 MT Refined
Approx 2% PB Will Be Given After Buyers Bank Guarantee Is Approved
110% By The Seller
Refined 950,00 USA/MT
Packaging Terms : In The Pet Bottle And International Standard Crude In The Flexitanks
Payment Terms : 100% Irrevocable or transferable LC MT 700 wiht monthly SBLC MT 760/MT agaist thet documents of the loading port and the SGS and Qand Q Audit repot of the loading port at the loading port or confirmed from top banks. Cif Delivery Fob payment
Product Name: DT281 Full Hydraulic Jumbo Drill Single-Booms Tunnel Trolley for Mining with Core Motor & Engine Components
Motor power: 75kw
Fuel tank capacity: 250L
Gas supply system flow: 0.36m³/min
Working pressure of air supply system: 0.3~0.7Mpa
Machinery Test Report: Provided